Latest CMRL News
Metro Rail Officials informed that logging tools installed in Metro Rails will immediately inform the driver and the control centre.
Posted On :17/Apr/2016 5:25:45 PM
In the 1st phase of the Chennai Public dream Project, Chennai Metro Rail Service, has been operating between Koyambedu - Alandur since last year.
Posted On :12/Apr/2016 4:43:09 PM
Chennai Metro Rail authorities have been demanding that Tamil Nadu government should provide electrical energy at subsidised rates. The state government has been reviewing this request.
Posted On :04/Apr/2016 5:57:16 PM
After the launch of the Chennai Metro Rail service between Koyambedu and Alandur the officials were looking at the possibility of tapping solar energy.
Posted On :01/Apr/2016 12:44:57 PM
Chennai Metro Rail Limited (CMRL) is gearing up on top speed to complete all its works. CMRL is likely to conduct a trial run next month on the 5-km underground stretch from Koyambedu to Shenoy Nagar.
Posted On :26/Mar/2016 12:05:11 PM
According to reliable sources the Chennai Metro Rail is likely to conduct a trial run in the 5 km underground stretch from Koyambedu to Shenoy Nagar next month.
Posted On :23/Mar/2016 9:30:05 AM
Phase-I of Chennai Metro Rail has two corridors, a 23.1-km stretch (Washermanpet to Airport) and another of 22 km (Chennai Central to St Thomas Mount).
Posted On :15/Mar/2016 2:28:22 PM
The elevated section of the Metrorail from Thirumangalam to Koyambedu station is progressing well.
Posted On :14/Mar/2016 12:40:36 PM
Southern Railway plans to speed up integration of the Chennai Beach-Velacherry MRTS line with the network.
Posted On :11/Mar/2016 11:30:56 AM
The Chennai Metro Rail (CMRL) successfully conducted an inspection trial run between Alandur and Airport recently using a self-propelled Overhead Maintenance Vehicle (OME).
Posted On :10/Mar/2016 11:10:09 AM