Latest CMRL News
Soil test is being made now for the for the proposed third broad gauge line from Tambaram to Chengalpattu.
Posted On :20/Jun/2016 2:33:19 PM
Chennai Metro Rail will be conducting the underground trial between Koyambedu and Shenoy Nagar from 25th June onwards.
Posted On :17/Jun/2016 4:19:49 PM
Officials of Chennai Metro Rail have identified six possible routes. The total length of the six corridors is 177.3 km.
Posted On :13/Jun/2016 10:27:21 AM
Now Chennai Metro Rail is considered as one of the important identity of Chennai city.
Posted On :06/Jun/2016 10:15:29 AM
All the activities of the project work in the tunnel track between Koyambedu and Shenoy Nagar have been completed.
Posted On :06/Jun/2016 9:51:31 AM
After about one year of pause, the preliminary works to construct underground stretch of Chennai metro rail in Anna Salai have got started.
Posted On :04/Jun/2016 5:44:47 PM
Chennai Metro Rail administration has announced that they will be conducting a food festival (Metro Nival) on 4th and 5th June at Chennai Vadapalani Metro Rail Station.
Posted On :03/Jun/2016 10:49:43 AM
The central cabinet ministry has accorded approval for the Chennai Metro Rail Expansion project.
Posted On :02/Jun/2016 6:30:55 PM
Safety report is being prepared since the trial runs are being conducted between St Thomas Mount and Chennai Airport.
Posted On :30/May/2016 4:28:54 PM
Considered one of the most attractive features of the Chennai, Metro trains have been operating between Koyambedu and Alandur from the last year.
Posted On :27/May/2016 3:46:11 PM