Latest CMRL News
Chennai Metro Rail services began the operations during the month of June 2015. The metro rail services between Koyambedu and Alandur had a overwhelming response.
Posted On :20/Jul/2016 11:35:43 AM
The service timings with Chennai Metro Rail might get extended as its service from Chennai Airport is likely to get connected with other parts of the city by end of August.
Posted On :09/Jul/2016 3:09:12 PM
Chennai Metro has been operating the section between Koyambedu and Alandur on the elevated corridor since June last year.
Posted On :06/Jul/2016 11:21:56 AM
Soil test is being made now for the for the proposed third broad gauge line from Tambaram to Chengalpattu.
Posted On :20/Jun/2016 2:33:19 PM
Chennai Metro Rail will be conducting the underground trial between Koyambedu and Shenoy Nagar from 25th June onwards.
Posted On :17/Jun/2016 4:19:49 PM
Officials of Chennai Metro Rail have identified six possible routes. The total length of the six corridors is 177.3 km.
Posted On :13/Jun/2016 10:27:21 AM
Now Chennai Metro Rail is considered as one of the important identity of Chennai city.
Posted On :06/Jun/2016 10:15:29 AM
All the activities of the project work in the tunnel track between Koyambedu and Shenoy Nagar have been completed.
Posted On :06/Jun/2016 9:51:31 AM
After about one year of pause, the preliminary works to construct underground stretch of Chennai metro rail in Anna Salai have got started.
Posted On :04/Jun/2016 5:44:47 PM
Chennai Metro Rail administration has announced that they will be conducting a food festival (Metro Nival) on 4th and 5th June at Chennai Vadapalani Metro Rail Station.
Posted On :03/Jun/2016 10:49:43 AM