Chennai`s pioneering 8-story Sholinganallur Metro Station transforms OMR in Phase II. This elevated interchange connects Corridor 3 & 5 with multi-level plazas, sky bridges, and viaducts through buildings up to 35m tall.
Top Features
- Plaza at level 1, platforms at 21.8m & 28.8m, plus retail tower.
- Four entry/exits for Tidel Park traffic relief.
- Part of Rs 63,246 crore network due 2028.
See this full video for exclusive details!