Latest CMRL News
The final speed trial for Chennai Metro Rail Limited (CMRL) Corridor 4 Phase II stretch from Vadapalani to Poonamallee Bypass
Posted On :13/Feb/2026 11:56:25 AM
The safety inspection for Chennai Metro Phase 2 – Route 4 has officially commenced on the 14.64 km elevated corridor
Posted On :12/Feb/2026 10:00:09 AM
The Railway Safety Commissioner has announced that the final safety inspection for the Poonamallee - Vadapalani Metro Rail cor
Posted On :10/Feb/2026 11:16:19 AM
Chennai Metro Rail Limited (CMRL) marked a key milestone in Phase 2, Corridor-3, with the successful breakthrough of the Downline Tunnel Boring Machine (TBM) “Noyyal” at the Mandaveli shaft on 07 February 2026.
Posted On :08/Feb/2026 11:39:06 AM
The Chennai Metro Rail Limited (CMRL) has announced that a detailed safety inspection will be conducted on
Posted On :06/Feb/2026 9:21:37 AM
CMRL has always endeavored to provide the people of Chennai a safe, efficient and reliable travel partner. A total of 93,28,937
Posted On :05/Feb/2026 1:00:30 PM
After a prolonged struggle, a tunnel boring machine (TBM) of Chennai Metro Rail Limited will reach Thirumayilai on February 9,
Posted On :04/Feb/2026 3:05:20 PM
Chennai Metro Rail Limited (CMRL) recorded a significant 15% rise in total revenue for 2024–25, reaching
Posted On :03/Feb/2026 10:44:07 AM
Chennai Metro Rail Limited (CMRL) has successfully completed the Intermediate Overhauling (IOH) Phase 1 of all its 52 metro trains
Posted On :30/Jan/2026 3:51:39 PM
On the occasion of Republic Day, which is being celebrated across the country today (Monday, January 26, 2026),
Posted On :26/Jan/2026 8:52:10 AM