Latest CMRL News
The Chennai Metro Rail Limited (CMRL) is set to complete the viaduct and double-decker stretch along Arcot Road between
Posted On :09/Aug/2025 1:46:02 PM
The Chennai Metro Rail Limited (CMRL) is set to beautify three major locations in Chennai, including the iconic Broken Bridge in Adyar.
Posted On :04/Aug/2025 1:32:05 PM
The Chennai Metro Rail Limited (CMRL) has commenced detailed feasibility studies for establishing semi-high-speed rail corridors
Posted On :02/Aug/2025 9:47:55 AM
The Chennai Metro Rail Limited (CMRL) has achieved a remarkable milestone by recording its highest-ever monthly
Posted On :01/Aug/2025 2:50:06 PM
In a major milestone for Chennai Metro Rail Phase 2, Tunnel Boring Machine “Peacock” (DL 1074) successfully completed
Posted On :23/Jul/2025 2:37:35 PM
Chennai Metro Rail Limited (CMRL) has been awarded the prestigious IGBC Gold Rating under the "Green Factory Building"
Posted On :19/Jul/2025 3:06:47 PM
Chennai Metro Rail Limited (CMRL) is set to begin construction of a multi-storey building at Arumbakkam Metro station,
Posted On :17/Jul/2025 5:08:08 PM
Due to a technical failure between Koyambedu and Ashok Nagar, direct train services between St. Thomas Mount and Chennai Central are operating with a 24-minute frequency.
Posted On :25/Jun/2025 7:55:08 AM
The Prime Minister’s Office has instructed the Railway Board to expedite the long-pending merger of Chennais MRTS with Chennai Metro
Posted On :20/Jun/2025 9:31:59 AM
Chennai Metro Rail Limited (CMRL) has been honored with two prestigious Global Greentech Environmental
Posted On :18/Jun/2025 1:11:31 PM