Kumari Palany & Co

No. of views : (4855)

Chennai Metro Rail to operate in 7 months

Posted on: 17/Feb/2014 4:03:34 PM

Chennai Metro trains will start running in 7 months. This was announced by the Mtero Rail Project Director, Mr. Narasimha Prasad.

The trains will run at an average speed of 40 m per hour. The 2nd day of test run between Koyambedu and Ash   ok Nagar covering a distance of 5.7 km was completed successfully.

Press reporters and some officials participated in the 2nd day test-run. The train was run at 40 km per hour. It took 20 minutes. The train ran without stopping in the stations in between during the first test-run for the day and reached Ashok Nagar in 8 minutes. While returning, it stopped at the stations. The test-run will continue. It will be gradually extended up to St. Thomas Mount.

The first quota of 5 trains has been imported from Brazil. The nalance 33 trains will be manufactured in Andhra Pradesh.

Security Features:

  • CCTV in every coach
  • Emergency button to alert the driver
  • Fire extinguishers
  • Driver can supervise the train run from his seat .
  • Emergency exits
  • The train will stop automatically if any disturbance is sensed in the tracks
  • Separate ladies’ coach where gents will not be allowed
  • Seats for ladies in other coaches too
  •  6% seats reserved fro differently-abled
  •  Wheel-chair availability for the differently abled
  •  Emergency help-line for ladies - 1860 425 1515

Special features

  • Fully air-conditioned
  •  Automatic doors open only when station is rached and the train stops fully.
  •  A speed of 80-90 km per hour
  • 1276 passengers per train – 176 seats & the rest standing
  •  Service failure complaints can be made from the phone provided in each coach
  •  Separate place for luggage
  •  Route maps in each coach

Post your requirement - We will connect with the right vendor or service provider