Kumari Palany & Co

No. of views : (2739)

Changes will be made in the pattern of suburban train services on 09.04.2015

Posted on: 08/Apr/2015 10:33:48 AM
Due to line block/power block to facilitate engineering works in Arakkonam – Tiruttani section, the following changes will be made in the pattern of suburban train services on 09.04.2015.

A. The following suburban train services will be fully cancelled.
  • Train No.43551 Arakkonam – Tiruttani EMU local scheduled to leave Arakkonam at 04.20 hrs. o­n 09.04.2015.
  • Train No.43552 Tiruttani – Arakkonam EMU local scheduled to leave Tiruttani at 04.55 hrs. o­n 09.04.2015.
  • Train No.43553 Arakkonam – Tiruttani EMU local scheduled to leave Arakkonam at 05.10 hrs. o­n 09.04.2015.

B. The following suburban train service will be partially cancelled.

Train No.43502 Tiruttani – MMC EMU local scheduled to leave Tiruttani at 05.40 hrs. o­n 09.04.2015.This train will be partially cancelled between Tiruttani – Arakkonam and run from Arakkonam to MMC.

II. CHANGES IN PATTERN OF SUBURBAN TRAIN SERVICES
IN CHENNAI – ARAKKONAM SECTION

Due to line block/power block from 00.15 hrs. to 03.15 hrs. to facilitate engineering works between Ambattur – Avadi, the following changes will be made in the pattern of suburban train services on 10th, 11th & 12th April, 2015.

A. The following suburban train services will be fully cancelled.
  • Train No.43001 MMC – Avadi EMU local scheduled to leave MMC at 00.15 hrs.
  • Train No.43801 Chennai Beach – Arakkonam EMU local scheduled to leave Chennai Beach at 01.20 hrs.
  • Train No.43891 Avadi – Pattabiram E Depot EMU local scheduled to leave Avadi at 02.55 hrs.
  • Train No.43102 Pattabiram E Depot – MMC EMU local scheduled to leave Pattabiram E Depot at 03.20 hrs.

B. The following passenger special trains will be run.

A passenger special train will be run from Chennai Beach to Arakkonam after the block period.

A passenger special train will be run from Avadi to MMC to suit the time of Train No.43102 (Pattabiram E Depot – MMC EMU local) after the block period.

Post your requirement - We will connect with the right vendor or service provider