Kumari Palany & Co

No. of views : (1948)

Trial run of a metro rail train was conducted on the second line

Posted on: 09/May/2014 9:32:53 AM
Chennai Metro Rail had conducted a trial run of a metro rail train on the second line between Koyambedu and Ashok Nagar. The line was recently electrified. The stretch is part of the CMBT-Alandur-St Thomas Mount elevated line scheduled to be opened for traffic early next year.
 
Two trains were pulled using a diesel locomotive at different speeds. Overhead power cables will be tested, after which rakes with metro rail engines will be tested. Officials will monitor performance of the tracks and the different parameters of the train in the coming days.
 
Several trials will have to be carried out before the line can be opened. The line till Ashok Nagar is ready and work on laying tracks and installing overhead cables from Ashok Nagar to Alandur is underway. The viaduct till Alandur station over Kathipara flyover is complete. Sources said CMRL officials planned to extend trialst o Alandur as early as possible.

Trials on the first track began in November last year. The train is also being run as a showpiece. 

Post your requirement - We will connect with the right vendor or service provider