https://www.Livechennai.com

Chennai - Arakkonam AC Electric Train Service to Begin on October 23

Updated: 22/Oct/2026 9:39:12 AM
1518 views
Chennai - Arakkonam AC Electric Train Service to Begin on October 23

A new air-conditioned suburban electric train service between Avadi, Chennai Central and Arakkonam is scheduled to begin on October 23, 2026. According to Southern Railway, the service will operate on a trial basis until December 24, offering passengers an additional travel option on weekdays.

AC Suburban Train Service Details

The 12-coach air-conditioned electric train will operate five days a week, from Monday to Friday. After the trial period, Southern Railway will review the service based on the assessment report before deciding whether to extend its operation.

Chennai - Arakkonam AC Train Timings

The train service will operate in both directions, connecting Avadi, Arakkonam and Chennai Central at different times throughout the day.

Departure Arrival Route
6:30 AM from Avadi 7:45 AM at Arakkonam Stops at all stations along the route
8:00 AM from Arakkonam 9:30 AM at Chennai Central Tiruvallangadu, Kadambathur, Tiruvallur, Tiruninravur, Villivakkam, Perambur and Basin Bridge
9:40 AM from Chennai Central 10:25 AM at Avadi Stops at all stations along the route
5:25 PM from Avadi 6:10 PM at Chennai Central suburban station Stops at all stations along the route
6:30 PM from Chennai Central suburban station 7:55 PM at Arakkonam Basin Bridge, Perambur, Villivakkam, Ambattur, Tiruninravur, Tiruvallur, Kadambathur and Tiruvallangadu
8:10 PM from Arakkonam 9:10 PM at Avadi Tiruvallangadu, Kadambathur, Tiruvallur and Tiruninravur

Trial Service Until December 24

The AC suburban electric train will run on a trial basis from October 23 to December 24, 2026. The continuation of the service beyond this period will depend on the findings of the trial assessment.

Passengers planning to use this service should check the latest Southern Railway announcements for any changes to the schedule or stopping pattern.