https://www.Livechennai.com

How to Apply for Tamil Nadu Rooftop Solar Subsidy Scheme?

Updated: 08/Oct/2026 3:35:12 PM
1338 views
How to Apply for Tamil Nadu Rooftop Solar Subsidy Scheme?

Eligible domestic electricity consumers can apply for the rooftop solar subsidy through the Pradhan Mantri Surya Ghar Muft Bijli Yojana National Portal. The Tamil Nadu State subsidy is integrated with the central scheme, so a separate application for the State subsidy is not required.

Step 1: Register on the PM Surya Ghar Portal

Visit the official PM Surya Ghar National Portal and select the registration option.

During registration, provide the required details, including:

- State

- Electricity Distribution Company

- Electricity Consumer Number

- Mobile Number

- Email ID, where required

After registration, log in using the details provided during the registration process.

Step 2: Submit the Rooftop Solar Application

After logging in, select the option to apply for a rooftop solar system.

Enter the required electricity connection and applicant details in the online application form and submit the application.

Once the application is submitted, a National Portal Reference Number is generated. This number is important for tracking and completing the subsequent process.

Step 3: Complete the Feasibility Process

The application is processed by the concerned electricity distribution authority.

For eligible residential applications, the required feasibility and approval process is completed through the online system. The current Tamil Nadu portal states that feasibility is waived for solar applications up to 3 kW.

Step 4: Select an Empanelled Solar Vendor

After the required approval, the consumer can select an eligible or empanelled solar vendor through the available portal.

The selected vendor will install the rooftop solar system according to the applicable technical and scheme requirements.

Tamil Nadu`s current solar portal specifies that systems claiming the applicable subsidy must use compliant modules and be installed through eligible empanelled vendors.

Step 5: Install the Rooftop Solar System

The selected vendor installs the solar panels and other required equipment at the consumer`s premises.

The installation should meet the technical requirements prescribed under the rooftop solar scheme.

After installation, the required installation details, plant photographs and other documents are submitted through the applicable online process.

Step 6: Apply for Net Metering

After the solar system is installed, thehe required net meter or applicable grid-connectivity process is completed.

The electricity distribution authority verifies the installation and completes the required meter and grid-connection formalities. The current Tamil Nadu process integrates net-meter-related services with the rooftop solar application system.

Step 7: Inspection and Commissioning

The installed rooftop solar system is inspected and verified by the concerned authority.

After the required inspection, meter installation and other formalities are completed, the solar system is commissioned and connected to the electricity grid.

Step 8: Central Subsidy is Processed

Once the required installation, inspection, commissioning and other formalities are completed, the central subsidy under the PM Surya Ghar Muft Bijli Yojana is processed.

The central subsidy is transferred directly to the eligible beneficiary`s bank account after the applicable verification process.

Step 9: Tamil Nadu State Subsidy is Processed Automatically

After the central subsidy is credited, the Tamil Nadu State subsidy process is triggered through the integrated system.

The State portal verifies the eligibility, commissioning details and bank information. If all applicable conditions are satisfied, the State subsidy is credited directly to the beneficiary`s bank account.

There is no need to submit a separate application for the Tamil Nadu State subsidy.

Tamil Nadu Rooftop Solar Subsidy: Total Benefit

The current Tamil Nadu Solar Homes Portal shows the combined central and State subsidy as follows:

Rooftop Solar Capacity Central Subsidy Tamil Nadu State Subsidy Total Subsidy
1 kW Rs.30,000 Rs.5,000 Rs.35,000
2 kW Rs.60,000 Rs.10,000 Rs.70,000
3 kW Rs.78,000 Rs.22,000 Rs.1,00,000
Above 3 kW Rs.78,000 Rs.22,000 Rs.1,00,000

The current State portal states that the State subsidy is released only after the required installation, net-metering, commissioning and central subsidy disbursal conditions are satisfied.

Documents Generally Required

Applicants may need to keep the following details or documents ready:

- Electricity consumer number

- Latest electricity bill

- Mobile number linked to the application

- Bank account details

- Applicant details

- Rooftop solar installation details

- Required photographs and technical documents

- Other documents requested during the online application process

The exact documents may vary depending on the application and verification requirements.

How to Track the Application Status?

Applicants can track the application through the relevant online portals using the application or reference number. The Tamil Nadu Solar Rooftop Portal provides facilities for checking application status and related solar installation services.

In Simple Terms

Register on PM Surya Ghar Portal → Submit rooftop solar application → Get approval → Select eligible vendor → Install solar panels → Complete net-metering and inspection → Central subsidy credited → Tamil Nadu State subsidy processed automatically.

Disclaimer: This information is provided for general informational purposes only. Subsidy amounts, eligibility conditions, documents, procedures and implementation guidelines may change. Applicants should verify the latest information on the official government portals before applying.