https://www.Livechennai.com

Chennai Corporation Plans to Re-Lay 753 Roads at Rs 121.85 Crore Across 15 Zones

Updated: 17/Nov/2026 9:23:10 AM
1422 views
Chennai Corporation Plans to Re-Lay 753 Roads at Rs 121.85 Crore Across 15 Zones

Greater Chennai Corporation invites bids for project management consultancy to improve 66 bus route roads and 687 interior roads under the Chief Minister’s Integrated Urban Development Mission.

The Greater Chennai Corporation (GCC) has initiated steps to improve Chennai`s road infrastructure by inviting bids for Project Management Consultancy (PMC) services covering the relaying and improvement of 753 roads across the city. The project has an estimated value of Rs 121.85 crore and will be implemented under the Chief Minister’s Integrated Urban Development Mission (CMIUDM).

The proposed Chennai road development project includes 66 Bus Route Roads (BRR) and 687 interior bitumen and concrete roads spread across the corporation`s 15 zones. The initiative aims to improve road conditions, ensure better construction quality and provide smoother travel for motorists and public transport users.

Chennai Road Relaying Project: Region-Wise Details

According to the project details, the Greater Chennai Corporation has divided the proposed road improvement works into four categories based on their location.

The 66 Bus Route Roads across 15 zones will be improved at an estimated cost of Rs 55.74 crore. In North Chennai, 185 interior bitumen and concrete roads will be relaid at a cost of Rs 16.37 crore.

The Central Region will receive the largest share of interior road works, covering 287 roads at an estimated cost of Rs 39.99 crore. Meanwhile, 215 roads in South Chennai will be improved at a cost of Rs 18.75 crore.

These works form part of the corporation`s broader plan to upgrade both major transport routes and residential streets across Chennai.

PMC Team to Monitor Road Construction and Quality

The selected Project Management Consultancy will play an important role in monitoring the road relaying works. Its responsibilities will include project planning, scheduling, preliminary site inspections, execution monitoring, quality control and quality assurance.

The PMC team must examine and approve the project execution plans submitted by contractors before construction begins. It will also review technical drawings and other project documents wherever necessary.

Another important responsibility will be coordinating with various government departments and utility providers, including electricity authorities, Chennai Metro Water and the Revenue Department, to obtain estimates and necessary information.

The consultant must also ensure that road measurements are properly verified at the site after the completion of construction.

GCC Warns Contractors Against Poor-Quality Road Works

The Greater Chennai Corporation has stressed that contractors must maintain proper construction standards while executing the road improvement projects.

Officials have warned that if newly relaid roads have incorrect s surface levels or height mismatches, contractors may be instructed to relay the affected roads.

The corporation has also indicated that contractors could face forfeiture of their security deposits and blacklisting if they fail to meet the required quality standards.

When Will Chennai Road Works Begin?

The Municipal Administration and Water Supply (MAWS) Department has issued a Government Order for the proposed road-laying works.

According to GCC officials, the projects are expected to begin in the coming days. The corporation expects the appointed contractors to complete the works in accordance with the prescribed quality standards.

The Chennai road relaying initiative is expected to improve road conditions across the North, Central and South regions, benefiting daily commuters, motorists and public transport services.

With 753 roads identified for improvement, the project represents a significant investment in Chennai`s urban road infrastructure.