Chennai Metro Latest News
Chennai Metro Rail Project, at the cost of Rs. 14,600 Crores is under progress. The coaches are manufactured in Brazil.
Posted On :15/Feb/2014 9:40:44 AM
The metro rail department recently stated that the Tamil Nadu government is inspecting the Vandallur-Meenjur road for the possibilities of laying metro rail track in it.
Posted On :14/Feb/2014 5:53:00 PM
Chennaites can soon see the Metro train trial between Koyambedu and Ashok Nagar in the next couple of days.
Posted On :14/Feb/2014 10:22:51 AM
The State government has set aside Rs. 36,000 Crores for Phase II of Chennai Metro Rail.
Posted On :13/Feb/2014 3:23:15 PM
L&T Ramboll is preparing a viability report for likely hood of Outer Ring Road (ORR) to have a Metro Rail and a rail luggage corridor, CMDA sources revealed.
Posted On :12/Feb/2014 5:31:45 PM
The transport department has come up with a dynamic fare structure for the upcoming monorail project.
Posted On :11/Feb/2014 5:10:52 PM
All is set ready for the event of a 5km test run of the metro rail train above the 100 feet road between Koyambedu and Ashok Pillar.
Posted On :11/Feb/2014 3:58:55 PM
Metro Rail will have trial run this week between Koyambedu�Ashok Pillar stretches.
Posted On :11/Feb/2014 2:10:06 PM
The governments realigned monorail route will connect Poonamallee in the northwest of Chennai and Vandalur far south through two corridors that will meet near the Kathipara intersection.
Posted On :05/Feb/2014 4:56:19 PM
The government is now carrying out the metro rail construction work between Chennai Vannarapetai �airport and central-st.thomas mount.
Posted On :05/Feb/2014 3:00:20 PM