Due to Line Block / Power Block to facilitate engineering works between Villivakkam � Ambattur railway stations in Chennai � Arakkonam section, changes will be made in the pattern of train services as detailed.
Posted On :24/Jun/2017 11:24:44 AM
The Computerised Passenger Reservation Centres in Chennai Division of Southern Railway will function for only one shift, similar to Sunday pattern of working (08.00 hrs. to 14.00 hrs), on 26.06.2017.
Posted On :24/Jun/2017 10:21:53 AM
By this weekend, Chennaites are set to get a special feature in Tambaram station that is not even available at Chennai Central. At the new coaching terminal built for Chennai, there is going to be a major food plaza where you can get vegetarian, non-vegetarian as well as fast food dishes.
Posted On :23/Jun/2017 4:06:51 PM
Due to Line Block to facilitate engineering works between Nayudupeta � Pedapariya in Chennai � Gudur section, changes will be made in the pattern of train services from 22.06.2017 to 16.08.2017.
Posted On :22/Jun/2017 10:05:20 AM
Train No.06548 Ernakulam � Yesvantpur special fare special train will leave Ernakulam at 14.45 hrs. on 21st, 28th June and 05th, 12th, 19th & 26th July, 2017 and reach Yesvantpur at 04.30 hrs. the next day.
Posted On :20/Jun/2017 10:06:29 AM
Due to Line Block to facilitate engineering works at Mahendravadi in Arakkonam � Katpadi section, changes will be made in the pattern of train services as detailed below.
Posted On :20/Jun/2017 9:52:53 AM
Due to Line Block and Power Block to facilitate engineering works between Ennore � Ponneri in Chennai � Gudur section, the following changes will be made in the pattern of train services from 19th June, 2017 to 05th July, 2017.
Posted On :19/Jun/2017 3:29:48 PM
This year, the popular festival of Deepavali falls on 18th October. As a trend, the people book their tickets early to visit their native places to celebrate Deepavali. This year, they have started booking right from 15th June.
Posted On :19/Jun/2017 2:45:48 PM
Due to Line Block to facilitate engineering works at Korukkupet yard, changes will be made in the pattern of train services on 19th June, 2017 as explained below.
Posted On :17/Jun/2017 11:33:57 AM
The escalator at platform no.5 & 6 of Chennai Egmore Railway Station is to be taken up for a major overhaul work.
Posted On :17/Jun/2017 10:27:15 AM