It is likely that the Chennai division of Southern Railways will kick-start 12-car electrical multiple unit trains during the start of next year.
Posted On :04/Sep/2017 2:39:48 PM
Line Block/Power Block is permitted in Tambaram Yard for construction of pedestrian subway using precast reinforced Concrete Cement boxes at Km 29/19-21 in lieu of Level Crossing No.30 and at Perungulathur Station.
Posted On :03/Sep/2017 11:24:45 AM
The following special train will be run to clear the extra rush of traffic due to dislocation of train services caused by heavy rains and flooding of railway tracks in North-East Frontier Railway.
Posted On :02/Sep/2017 5:20:33 PM
The following train services are fully cancelled due to floods in Mumbai area.
Posted On :02/Sep/2017 2:30:43 PM
The Computerised Passenger Reservation Centres in Chennai Division of Southern Railway will function for only one shift, similar to Sunday pattern of working (08.00 hrs. to 14.00 hrs), on 04.09.2017, Monday.
Posted On :02/Sep/2017 10:31:08 AM
Due to Line Block to facilitate engineering works between Ponneri � Elavur in Chennai � Gudur section, changes will be made in suburban train services from 03rd September, 2017 to 28th September, 2017 except.
Posted On :02/Sep/2017 9:55:24 AM
Train No.17230 / 17229 Hyderabad � Thiruvananthapuram � Hyderabad Sabari express trains will be temporarily augmented by one AC 3-tier coach ex Hyderabad from 03.09.2017 to 02.10.2017 and ex Thiruvananthapuram.
Posted On :01/Sep/2017 6:30:02 PM
Due to Line Block to facilitate engineering works between Ponneri � Elavur in Chennai � Gudur section, changes will be made in train services on 01st & 02nd September, 2017 as detailed below.
Posted On :01/Sep/2017 9:55:00 AM
Due to dislocation of train services caused by floods in Mumbai area, the following train services are cancelled.
Posted On :01/Sep/2017 9:46:05 AM
Due to dislocation of train services caused by floods in Mumbai area, the following train services are rescheduled as given below.
Posted On :31/Aug/2017 5:19:59 PM