Latest CMRL News

Page   1 9293949596 128 
Chennai Metro Rail services between Alandur and Airport to begin soon
...........................................................................................................................
    Chennai Metro Rail services began the operations during the month of June 2015. The metro rail services between Koyambedu and Alandur had a overwhelming response.
Posted On : 20/Jul/2016 11:35:43 AM View More & Comment (2407)

Chennai Metro Rail services to get extended in August
...........................................................................................................................
    The service timings with Chennai Metro Rail might get extended as its service from Chennai Airport is likely to get connected with other parts of the city by end of August.
Posted On : 09/Jul/2016 3:09:12 PM View More & Comment (2015)

Chennai Metro rail fare likely to go up?
...........................................................................................................................
    Chennai Metro has been operating the section between Koyambedu and Alandur on the elevated corridor since June last year.
Posted On : 06/Jul/2016 11:21:56 AM View More & Comment (2412)

Soil test for the proposed third broad gauge line from Tambaram to Chengalpattu
...........................................................................................................................
    Soil test is being made now for the for the proposed third broad gauge line from Tambaram to Chengalpattu.
Posted On : 20/Jun/2016 2:33:19 PM View More & Comment (3796)

Underground trial between Koyambedu and Shenoy Nagar from 25th June
...........................................................................................................................
    Chennai Metro Rail will be conducting the underground trial between Koyambedu and Shenoy Nagar from 25th June onwards.
Posted On : 17/Jun/2016 4:19:49 PM View More & Comment (2535)

Six possible routes have been identified by Chennai Metro Rail
...........................................................................................................................
    Officials of Chennai Metro Rail have identified six possible routes. The total length of the six corridors is 177.3 km.
Posted On : 13/Jun/2016 10:27:21 AM View More & Comment (4900)

Anna Salai Metro Rail works to commence during the month of August
...........................................................................................................................
    Now Chennai Metro Rail is considered as one of the important identity of Chennai city.
Posted On : 06/Jun/2016 10:15:29 AM View More & Comment (2024)

Test run of Metro Rail in the tunnel route between Koyambedu and Shenoy Nagar
...........................................................................................................................
    All the activities of the project work in the tunnel track between Koyambedu and Shenoy Nagar have been completed.
Posted On : 06/Jun/2016 9:51:31 AM View More & Comment (1982)

Tunneling works on Anna Salai to resume
...........................................................................................................................
    After about one year of pause, the preliminary works to construct underground stretch of Chennai metro rail in Anna Salai have got started.
Posted On : 04/Jun/2016 5:44:47 PM View More & Comment (2623)

Page   1 9293949596 128