Kumari Palany & Co

No. of views : (6593)

Power shutdown areas in Chennai on 25-10-16

Posted on: 24/Oct/2016 4:29:47 PM
Power supply will be suspended in the following areas on 25-10-16 between 9.00 A.M. to 2.00 P.M. for maintenance work.Supply will be resumed before 2.00 P.M. if the works are completed.

K.K.NAGAR AREA : No. 69&71,72 st -11st sector, 14th st -4th sector,51,52,53,54th st-9th sector, 61,62,&64,65th – 10th sector.PADI AREA : RS road, Duraisamy reddy 1st & 2nd st, 61st to 70th st, North Avenue road, Rukumani ammal st, 72nd st, Kannagi st, 39th and 41st st, Anna st.
CHEMBARAMBAKKAM  AREA : Nazarathpet, Meppur, Varatharajapuram, BangaloreTrunk road, part of Chembarambakkam, Part of Thirumazhisai, part of Malayambakkam, Agaramel. 
REDHILLS AREA : Redhills GNT road (partly), Naravarikuppam, Padianallur, Sothupakkam, Alinjivakkam, Vilangadupakkam, Kossapur, Sendrambakkam, Theeyampakkam, Sirungavur, Theerthakaraiyan pattu, Palavoyal.
THILLAIGANGA NAGAR AREA : T.G. nagar, Ram nagar, Indra nagar, Shanthi nagar, part of Palavanthangal, part of Naganallur, part of Ullagaram, part of Puzhutivakkam, AGS colony, Andal nagar, part of Adambakkam, Dr. Ambethkar nagar, Kakkan nagar, New colony.
VALASARAVAKKAM AREA: Janaki nagar one part, Prakasam salai, Chowdry nagar,Bethaniya nagar, Dr. Ambethkar salai, Madurai Meenakchiamman nagar,Kalaingar, Anna, Periyar st, Rajaji avenue, Gopal avenue, Arcotroad(Pragasam salai to Sridevi Kuppam Main road Juction),  Mejastic colony,Kannamal nagar, Indira nagar, Ramamoorthy salai, 
VIRUGAMBAKKAM AREA: part of Gandhi road, part of Alwarthirunagar annexe,part of Lakshmi nagar, AVM avenue 2 to 8th sts, Thangal st, Narayanasamy st, Thangal Ulvai st, Otta pillaiyar koil st, Reddy st, Yadhaval st, part of Kaliamman koil st.
PERUMBAKKAM AREA : Jalladayanpattai, BHEL Nagar, Pallikarani (part),Gowrivakkam (part), Medavakkam, Perumbakkam, Vengaivasal.

Post your requirement - We will connect with the right vendor or service provider