Latest CMRL News

Page   1234 128 
Chennai Metro Corridor 4 Phase II - Final Speed Trial Soon Before Approval
...........................................................................................................................
    The final speed trial for Chennai Metro Rail Limited (CMRL) Corridor 4 Phase II stretch from Vadapalani to Poonamallee Bypass
Posted On : 13/Feb/2026 11:56:25 AM View More & Comment (2621)

Chennai Metro Phase 2 Route 4 Safety Inspection | Poonamallee to Vadapalani Elevated Corridor
...........................................................................................................................
    The safety inspection for Chennai Metro Phase 2 – Route 4 has officially commenced on the 14.64 km elevated corridor
Posted On : 12/Feb/2026 10:00:09 AM View More & Comment (1377)

Final Safety Inspection Begins for Poovrindavalli–Vadapalani Metro Line
...........................................................................................................................
    The Railway Safety Commissioner has announced that the final safety inspection for the Poonamallee - Vadapalani Metro Rail cor
Posted On : 10/Feb/2026 11:16:19 AM View More & Comment (3418)

Noyyal TBM Breaks Through at Mandaveli Station in Chennai Metro Phase 2
...........................................................................................................................
    Chennai Metro Rail Limited (CMRL) marked a key milestone in Phase 2, Corridor-3, with the successful breakthrough of the Downline Tunnel Boring Machine (TBM) “Noyyal” at the Mandaveli shaft on 07 February 2026.
Posted On : 08/Feb/2026 11:39:06 AM View More & Comment (5587)

Safety Inspection Planned at 10 Stations on Poonamallee - Vadapalani Metro Corridor
...........................................................................................................................
    The Chennai Metro Rail Limited (CMRL) has announced that a detailed safety inspection will be conducted on
Posted On : 06/Feb/2026 9:21:37 AM View More & Comment (4246)

93.28 lakhs passengers recorded to have travelled in January, 2026
...........................................................................................................................
    CMRL has always endeavored to provide the people of Chennai a safe, efficient and reliable travel partner. A total of 93,28,937
Posted On : 05/Feb/2026 1:00:30 PM View More & Comment (3317)

Chennai Metro TBM to Break Through at Thirumayilai on Feb 9 After 1.5-Year Delay
...........................................................................................................................
    After a prolonged struggle, a tunnel boring machine (TBM) of Chennai Metro Rail Limited will reach Thirumayilai on February 9,
Posted On : 04/Feb/2026 3:05:20 PM View More & Comment (3021)

CMRL Revenue Surges 15% in 2024 - 25 on Strong Non-Fare Growth
...........................................................................................................................
    Chennai Metro Rail Limited (CMRL) recorded a significant 15% rise in total revenue for 2024–25, reaching
Posted On : 03/Feb/2026 10:44:07 AM View More & Comment (3517)

CMRL Completes Intermediate Overhauling (IOH) Phase 1 for Entire Metro Fleet
...........................................................................................................................
    Chennai Metro Rail Limited (CMRL) has successfully completed the Intermediate Overhauling (IOH) Phase 1 of all its 52 metro trains
Posted On : 30/Jan/2026 3:51:39 PM View More & Comment (2610)

Page   1234 128